12/13/09

house building - week 16

so we are 16 weeks into building our houses, some homes are almost to the half-way point. Some people are excited about that, because they think the second half goes by faster than the first. I disagree it's called the HALFWAY point, because it is half done - it's not the two-thirds point, with only one third left - it's HALF - which means that we won't be done until 32 weeks -- that is getting dangerously close to the end of April - and we have to be done by April, so that we can get the stimulus money for first time home buyers. We have to be MOVED IN by April 30. Which means we have to have our open house and everything so we can get the certificate of occupancy.

anyway - house #1 has windows, doors, mostly shingled, and the rocking is started - but they have no electricity so that is what is next for them.
house # 2 has windows except for 2 that were resized, doors that need a little more leveling, mostly shingled, the rock started, and they have elecrticity - so insulation and sheetrock are next for them.
house # 3 (OUR HOUSE) has NO windows (mysteriously lost somewhere), we do have doors, and some shingles, and electricity, so as soon as we find those darn windows and get them in, then our house is next for insulation and sheetrock, and maybe rocking.
house #4 has windows, doors, electricity, some shingles. Not sure what is next for them.
house #5 has a roof, the blocking is FINALLY done, and doors are next for them.
house #6 has no roof yet, so that is what is next for them - and it will take 2 days, then we will have to shovel out all the snow from inside (UGH)