3/16/10

Kitchen Cabinets



well, the plan was that we would get our cabinets put in tomorrow (wed) - but for some unknown reason, the cabinet subcontractor put ours in on Monday (skipping our neighbors house that was supposed to get them on Mon.). And now he has decided to take a week off, and won't be back til next monday.
I really like them, but he did a few things wrong, so when he does come back to work, he had better fix them. (the cabinets above the fridge are too low for the 70" upgraded fridge I got, several of the doors open backwards, and the "island" counter area is at a horrible angle - if I put stools there to sit on, the people would be sitting right in the walk way area, and looking right down both hallways to the bedrooms)

No comments: